poincianavistas.site
About Poinciana Vistas
Contact
Mailing List
Forms
Visitor Parking Permit
Pet Approval Form
All Lot Improvement Forms
Booking Form
Message
Lot Improvement (Solar Panels)
Please enable JavaScript in your browser to complete this form.
Please enable JavaScript in your browser to complete this form.
Applicant Details
Lot Number:
*
Enter your Lot Number as a number only, e.g. 7 or 45
Applicant's Name:
*
First
Last
Are you the Owner or a Co-Owner?
Owner
Co-Owner
Your preferred contact number:
*
The flag on the left is set for Australia.
Do not click it.
If you change it, the phone number you enter will not match the Australian phone number format. Do not enter spaces, as the number will be automatically formatted correctly for you after it is entered.
Your Email
*
Email
Confirm Email
Lot Improvement Details
Who will install the solar panels?
*
An appropriately qualified and licenced tradesperson
Do you know the tradesperson’s QBCC Licence Number?
*
yes
no
What is the tradesperson’s QBCC Licence Number?
*
Solar panels must be installed by a tradesperson with the necessary Licence. If the tradesperson’s QBCC Licence Number is unknown at the time of submitting this Application you agree to supply that information to the Body Corporate before commencing the installation of the solar panels.
*
Yes
How many solar panels will be installed?
*
Enter a number only, e.g. 16
What is the total capacity of the system in kW?
*
Enter a number only, e.g. 6.3
Will a storage battery be installed?
Yes
No
Facing your home from the road, on which side, or sides, of the roof will the solar panels be installed?
Front
Rear
Left
Right
Facing your home from the road, on which side will the inverter installed?
Front
Rear
Left
Right
Acceptance of Conditions of Approval
Conditions of Approval
That the work is carried out by suitably qualified and experienced tradespeople.
That the work is carried out by an appropriately licensed and insured tradesperson.
That you are liable for, and will rectify at your cost, any damage done by overspray, or any other kind of damage done to any other Lot by your contractor or others associated with this work.
If any Common Property areas are damaged by your contractor or others associated with this work, the cost to fix and/or clean the damage will be paid for by you.
That the people undertaking the installation will comply with all noise and environmental regulations as set by Gold Coast City Council and/or the Queensland Government and/or the Australian Government.
That if any water pressure cleaning of any surface causes wash-off, the wash-off is handled in the manner prescribed by Gold Coast City Council.
That the people undertaking the installation will observe all applicable workplace health and safety legislation.
That the installation does not compromise the integrity of the soundproofing or fireproofing or storm water run-off of the home, or to the homes either side of the home.
That the installation will be maintained to the satisfaction of the Body Corporate Committee.
That you are aware that the Body Corporate insurance does cover the solar panels but the insurance company needs to be advised of the installation and that you will be responsible for any insurance premium increase caused by the installation of the solar panels.
That the installation and future maintenance of the installation is at the expense of the Lot Owner (at the time).
That you must pay for, and maintain, the installation.
That the installation will be finalised within 90 days of the approval being given.
That, should any of the conditions of approval be breached, the Committee reserves the right to request the installation be removed or rectified at your expense.
If permission is granted for this Lot Improvement, do you agree to the following Conditions of Approval?
*
Yes
Is all of the information you have supplied, correct?
Yes
Just a bit of math to ensure that you are not a robot
*
=
the installation Licence
How easy was it for you to complete this form?
Very Hard
Hard
Neutral
Easy
Very Easy
Very Hard
Item #1 Very Hard
Hard
Item #1 Hard
Neutral
Item #1 Neutral
Easy
Item #1 Easy
Very Easy
Item #1 Very Easy
Submit