poincianavistas.site
About Poinciana Vistas
Contact
Mailing List
Forms
Visitor Parking Permit
Pet Approval Form
All Lot Improvement Forms
Booking Form
Message
Lot Improvement (Concrete Slab)
Please enable JavaScript in your browser to complete this form.
Please enable JavaScript in your browser to complete this form.
Applicant Details
Lot Number:
*
Enter your Lot Number as a number only, e.g. 7 or 45
Applicant's Name:
*
First
Last
Are you the Owner or a Co-Owner?
*
Owner
Co-Owner
Your preferred contact number:
*
The flag on the left is set for Australia.
Do not click it.
If you change it, the phone number you enter will not match the Australian phone number format. Do not enter spaces, as the number will be automatically formatted correctly for you after it is entered.
Your Email
*
Email
Confirm Email
Lot Improvement Details
Who will install the concrete slab?
*
An appropriately qualified and licenced tradesperson
Do you know the tradesperson’s QBCC Licence Number?
*
yes
no
What is the tradesperson’s QBCC Licence Number?
*
Concrete slabs must be installed by a tradesperson with the necessary Licence. If the tradesperson’s QBCC Licence Number is unknown at the time of submitting this Application you agree to supply that information to the Body Corporate before commencing the installation of the air conditioner.
*
Yes
Is this a new installation or are you replacing an existing concrete slab?
*
new
replacement
What is the width of the slab (in metres)?
*
What is the length of the slab (in metres)?
*
What is the height of top surface of slab from ground level (thickness of the slab) (in cm)?
*
What treatment will be made to the top surface of the slab?
plain concrete
exposed aggregate (Pebblecrete)
tiled
Facing the home from our internal road, near which wall of the house will the slab be installed?
*
rear
left side
right side
front
On what base will the slab be installed on?
*
compacted sand
compacted gravel
installed on the existing ground
Will a plastic membrane be placed under the slab?
*
yes
no
Will the slab slope away from the house?
*
yes
no
Will the slab be reinforced with steel?
*
yes
no
Is there a gap of at least 1cm from the edge of the slab surface to the edge of the home?
*
yes
Will the slab adjoin a boundary fence?
*
yes
no
If the slab adjoins a fence, will a drainage channel be installed at the fence line?
*
yes
no
Will the drainage channel be connected to storm water?
*
yes
Have your neighbours been notified?
*
yes
no
Do your neighbours have any objections?
*
no
base boundary the
Do you intend to put a structure on the slab?
*
yes
no
What kind of structure?
*
e.g. garden shed, pergola
Will you be submitting plans to GCCC for approval of that structure?
*
yes
no
NOTE:
Any construction on the slab needs to be a Class 10 building or structure (a building or structure that cannot be occupied) up to 10m² in area and under 2.4m high. The height cannot exceed 2.1m, and no side shall exceed 5m in length. The building can be a tool shed, lawn locker, un-roofed deck (with the floor no higher than 1m above natural ground level), greenhouse, or anything else that meets these requirements.
Acceptance of Conditions of Approval
Conditions of Approval
That the work is carried out by suitably qualified and experienced tradespeople.
That the work is carried out by an appropriately licensed and insured tradesperson.
That you are liable for, and will rectify at your cost, any damage done by overspray, or any other kind of damage done to any other Lot by your contractor or others associated with this work.
If any Common Property areas are damaged by your contractor or others associated with this work, the cost to fix and/or clean the damage will be paid for by you.
That the people undertaking the installation will comply with all noise and environmental regulations as set by Gold Coast City Council and/or the Queensland Government and/or the Australian Government.
That if any water pressure cleaning of any surface causes wash-off, the wash-off is handled in the manner prescribed by Gold Coast City Council.
That the people undertaking the installation will observe all applicable workplace health and safety legislation.
That the installation does not compromise the integrity of the soundproofing or fireproofing or storm water run-off of the home, or to the homes either side of the home.
That the installation will be maintained to the satisfaction of the Body Corporate Committee.
That you are aware that the Body Corporate insurance does not cover the concrete slab but the Body Corporate’s insurance company needs to be advised of the installation, and that you will be responsible for any insurance premium increase caused by the installation of the concrete slab, and that you will take out your own insurance cover on the concrete slab.
That the installation and future maintenance of the installation is at the expense of the Lot Owner (at the time).
That you must pay for, and maintain, the installation.
That the installation will be finalised within 90 days of the approval being given.
That, should any of the conditions of approval be breached, the Committee reserves the right to request the installation be removed or rectified at your expense.
If permission is granted for this Lot Improvement, do you agree to the above Conditions of Approval?
*
Yes
Is all of the information you have supplied, correct?
Yes
Just a bit of math to ensure that you are not a robot
*
=
How easy was it for you to complete this form?
Very Hard
Hard
Neutral
Easy
Very Easy
Very Hard
Item #1 Very Hard
Hard
Item #1 Hard
Neutral
Item #1 Neutral
Easy
Item #1 Easy
Very Easy
Item #1 Very Easy
Submit