poincianavistas.site
About Poinciana Vistas
Contact
Mailing List
Forms
Visitor Parking Permit
Pet Approval Form
All Lot Improvement Forms
Booking Form
Message
Lot Improvement (Garden Shed)
Please enable JavaScript in your browser to complete this form.
Please enable JavaScript in your browser to complete this form.
Applicant Details
Lot Number
*
Enter your Lot Number as a number only, e.g. 7 or 45
Applicant's Name:
*
First
Last
Are you the Owner or a Co-Owner?
*
Owner
Co-Owner
Your preferred phone contact number
*
The flag on the left is set for Australia.
Do not click it.
If you change it, the phone number you enter will not match the Australian phone number format. Do not enter spaces, as the number will be automatically formatted correctly for you after it is entered.
Your Email:
*
Email
Confirm Email
Email: of of
Lot Improvement Details
Who will be doing this lot improvement?
*
an appropriately qualified and licenced tradesperson
a person with appropriate skills and ability
Do you know the tradesperson’s QBCC Licence Number?
Yes
No
What is the tradesperson’s QBCC Licence Number?
*
If this Lot Improvement will cost more than $3,300 including GST and involves building works, or if the task includes plumbing or electrical works, that part of the works must done by a tradesperson with the necessary Licence. If you are going to use a tradesperson to do this work and the tradesperson’s QBCC Licence Number is unknown at the time of submitting this Application you agree to supply that information to the Body Corporate before work commences.
*
Yes
What will the garden shed be installed on?
*
on a suitable concrete slab
on suitable concrete pavers
on compacted earth
Where will the garden shed be located?
*
next to the fence at the right-hand side of the boundary to the lot
next to the fence at the left-hand side of the boundary to the lot
next to the fence at the rear of the boundary to the lot
next to a wall at the right-hand side of the home
next to a wall at the left-hand side of the home
next to a wall at the rear of the home
Width of shed in metres
*
Enter the dimension to one decimal place (I.e. if the shed is 3.6 metres wide, enter 3.6).
Depth of shed in metres
*
Enter the dimension to one decimal place (I.e. if the shed is 2 metres deep, enter 2.0).
Height of shed at its maximum height in metres
*
Enter the dimension to one decimal place (I.e. if the shed is 2 metres high at its highest point, enter 2.0).
Will the height of the shed exceed the current height of the nearest bordering fence?
will
will not
What colour will the shed be?
*
If the shed will not be painted, please enter not painted at all
Acceptance of Conditions of Approval
Conditions of Approval
That the work is carried out by suitably qualified and experienced tradespeople or by people with the necessary skill and ability to do the lot improvement to a high standard of finish.
That, if the lot improvement is done by a tradesperson, the tradesperson is appropriately licensed and insured.
That the Applicant is liable for, and will rectify at the Applicant’s cost, any damage done by overspray, or any other kind of damage done to any other Lot by the Applicant’s contractor/s, or others associated with this work.
If any Common Property areas are damaged by the Applicant’s contractor/s, or others associated with this work, the cost to fix and/or clean the damage will be paid for by the Applicant.
That the people undertaking the work will comply with all noise and environmental regulations as set by Gold Coast City Council and/or the Queensland Government and/or the Australian Government.
That if any water pressure cleaning of any surface causes wash-off, the wash-off is handled in the manner prescribed by Gold Coast City Council.
That the people undertaking the lot improvement will observe all applicable workplace health and safety legislation.
That the lot improvement and future maintenance of the lot improvement is at the expense of the Lot Owner (at the time).
That the Applicant must pay for, and maintain, the lot improvement.
That the lot improvement will be finalised within 90 days of the approval being given.
That, should any of the conditions of approval be breached, or the lot improvement is not completed to a standard accepted by the Committee on behalf of the Body Corporate, the Committee reserves the right to request the lot improvement be redone at the Applicant’s expense.
If permission is granted for this Lot Improvement, do you agree to the Conditions of Approval?
*
Yes
Is all of the information you have supplied, correct?
*
Yes
Just a bit of math to ensure that you are not a robot
*
=
How easy was it for you to complete this form?
*
Very hard
Hard
Neutral
Easy
Very Easy
Very hard
Item #1 Very hard
Hard
Item #1 Hard
Neutral
Item #1 Neutral
Easy
Item #1 Easy
Very Easy
Item #1 Very Easy
Submit