poincianavistas.site
About Poinciana Vistas
Contact
Mailing List
Forms
Visitor Parking Permit
Pet Approval Form
All Lot Improvement Forms
Booking Form
Message
Lot Improvement (Deck)
Please enable JavaScript in your browser to complete this form.
Please enable JavaScript in your browser to complete this form.
Applicant Details
Lot Number:
*
Enter your Lot Number as a number only, e.g. 7 or 45
Applicant's Name:
*
First
Last
Are you the Owner or a Co-Owner?
*
Owner
Co-Owner
Your preferred contact number:
*
The flag on the left is set for Australia.
Do not click it.
If you change it, the phone number you enter will not match the Australian phone number format. Do not enter spaces, as the number will be automatically formatted correctly for you after it is entered.
Your Email
*
Email
Confirm Email
Lot Improvement Details
Who will install the deck?
*
An appropriately qualified and licenced tradesperson
Do you know the tradesperson’s QBCC Licence Number?
*
yes
no
What is the tradesperson’s QBCC Licence Number?
*
Decks must be installed by a tradesperson with the necessary Licence. If the tradesperson’s QBCC Licence Number is unknown at the time of submitting this Application you agree to supply that information to the Body Corporate before commencing the installation of the air conditioner.
*
Yes
Is this a new installation or are you replacing an existing deck?
*
new
replacement
What is the width of the deck (in metres)?
*
of Conditions used?
What is the length of the deck (in metres)?
*
What is the height of the base of the deck from ground level (in cm)?
*
What is the height of top surface of deck from ground level (in cm)?
*
Facing the home from our internal road, near which wall of the house will the deck be installed?
*
rear
left side
right side
front
What style of footings will be used?
*
H4 100mm x 100mm treated pine posts set at a maximum 1800mm centres
steel posts
galvanised steel stirrups
TuffBlock
Will the footings be set in concrete?
*
yes
no
What construction method will be used?
*
steel frame
aluminium frame
bearers and joists
The bearers will be:
*
steel
aluminium
F7 Grade H3 timber 140mm x 45mm set at a maximum span of 1300 mm
F7 Grade H3 timber 2 140mm x 45mm set at a maximum span of 1900 mm
F7 Grade H3 timber 190mm x 45mm set at a maximum span of 1750 mm
F7 Grade H3 timber 2 190mm x 45mm set at a maximum span of 2600 mm
F7 Grade H3 timber 240mm x 45mm set at a maximum span of 2450 mm
The joists will be:
*
steel
aluminium
F7 Grade H3 timber 90mm x 45mm set at a maximum span of 1400 mm
F7 Grade H3 timber 140mm x 45mm set at a maximum span of 2200 mm
F7 Grade H3 timber 190mm x 45mm set at a maximum span of 3200 mm
F7 Grade H3 timber 240mm x 45mm set at a maximum span of 4200 mm
The noggins will be:
*
steel
aluminium
the same timber size as the joists, set at a staggered pattern with 1200mm centres
The deck slats will be:
*
H3 timber
composite material
What treatment will be made to the decking?
stained
painted
none (composite material)
Will all screws, bolts and fittings be galvanised or otherwise anti-corrosion treated?
*
yes
no
Will the deck slope away from the house?
*
yes
no
Is there a gap of at least 1cm from the edge of the deck surface to the edge of the home?
*
yes
Will the deck adjoin a boundary fence?
*
yes
no
If the deck adjoins a fence, will a drainage channel be installed at the fence line?
*
yes
no
Will the drainage channel be connected to storm water?
*
yes
Have your neighbours been notified?
*
yes
no
Do your neighbours have any objections?
*
no
Do you intend to put a structure on the deck?
*
yes
no
What kind of structure?
*
e.g. pergola
Will you be submitting plans to GCCC for approval of that structure?
*
yes
no
NOTE:
Any construction on the slab needs to be a Class 10 building or structure (a building or structure that cannot be occupied) up to 10m² in area and under 2.4m high. The height cannot exceed 2.1m, and no side shall exceed 5m in length. The building can be a tool shed, lawn locker, un-roofed deck (with the floor no higher than 1m above natural ground level), greenhouse, or anything else that meets these requirements.
Acceptance of Conditions of Approval
Conditions of Approval
That the work is carried out by suitably qualified and experienced tradespeople.
That the work is carried out by an appropriately licensed and insured tradesperson.
That you are liable for, and will rectify at your cost, any damage done by overspray, or any other kind of damage done to any other Lot by your contractor or others associated with this work.
If any Common Property areas are damaged by your contractor or others associated with this work, the cost to fix and/or clean the damage will be paid for by you.
That the people undertaking the installation will comply with all noise and environmental regulations as set by Gold Coast City Council and/or the Queensland Government and/or the Australian Government.
That if any water pressure cleaning of any surface causes wash-off, the wash-off is handled in the manner prescribed by Gold Coast City Council.
That the people undertaking the installation will observe all applicable workplace health and safety legislation.
That the installation does not compromise the integrity of the soundproofing or fireproofing or storm water run-off of the home, or to the homes either side of the home.
That the installation will be maintained to the satisfaction of the Body Corporate Committee.
That you are aware that the Body Corporate insurance does not cover the deck but the Body Corporate’s insurance company needs to be advised of the installation, and that you will be responsible for any insurance premium increase caused by the installation of the deck, and that you will take out your own insurance cover on the deck.
That the installation and future maintenance of the installation is at the expense of the Lot Owner (at the time).
That you must pay for, and maintain, the installation.
That the installation will be finalised within 90 days of the approval being given.
That, should any of the conditions of approval be breached, the Committee reserves the right to request the installation be removed or rectified at your expense.
If permission is granted for this Lot Improvement, do you agree to the Conditions of Approval?
*
Yes
Is all of the information you have supplied, correct?
Yes
Just a bit of math to ensure that you are not a robot
*
=
How easy was it for you to complete this form?
Very Hard
Hard
Neutral
Easy
Very Easy
Very Hard
Item #1 Very Hard
Hard
Item #1 Hard
Neutral
Item #1 Neutral
Easy
Item #1 Easy
Very Easy
Item #1 Very Easy
Submit